Factory Uptime Jumps to 99.9 %

Tech adjusting network switch on factory floor

Manufacturing Case Study – Factory Uptime Soars

Project: Modernise network and monitoring across three production plants

  • Problem: Network drops averaged 8 hours/month, halting CNC lines and ERP access
  • Solution: Installed redundant fibre links, smart switches, and 24/7 IoT‑based monitoring
  • Result:
  • Uptime climbed to 99.95 % (outages cut by 75 %)
  • Production output rose 12 % with fewer stoppages
  • Maintenance tickets fell 60 % thanks to early‑warning alerts
  • Real‑time dashboard shows line status and network health at a glance
  • Automated fail‑over keeps PLCs online during link lossQuarterly reviews now forecast upgrades, preventing surprise downtime